• The DOE would oversee Future Gen and pay 74% of the costs; a group of energy companies, called the Future Gen Alliance, would pay for the rest and design, build and manage the project.

    美国能源部原计划监管FutureGen并且支付74%费用;由几家能源公司组成的Future Gen联盟支付其余的资金设计建造管理项目。

    youdao

  • This article carries on the design to the nitrogen generator automatic control system by PSA, it controls valves by PLC to realize in the industrial production have continuous, gen

    本文对变吸附氮气发生器自动控制系统进行设计,通过可编程控制器(PLC控制多个阀门实现工业生产氮气连续,大量需求。

    youdao

  • This article carries on the design to the nitrogen generator automatic control system by PSA, it controls valves by PLC to realize in the industrial production have continuous, gen

    本文对变吸附氮气发生器自动控制系统进行设计,通过可编程控制器(PLC控制多个阀门实现工业生产氮气连续,大量需求。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定