The DOE would oversee Future Gen and pay 74% of the costs; a group of energy companies, called the Future Gen Alliance, would pay for the rest and design, build and manage the project.
美国能源部原计划要监管Future Gen并且支付74%的费用;由几家能源公司组成的Future Gen联盟将支付其余的资金并设计、建造和管理该项目。
This article carries on the design to the nitrogen generator automatic control system by PSA, it controls valves by PLC to realize in the industrial production have continuous, gen…
本文对变压吸附氮气发生器的自动控制系统进行设计,通过可编程控制器(PLC)来控制多个阀门以实现工业生产上对氮气的连续,大量需求。
应用推荐