The wave force on the steel-pipe pile which was connected and unconnected to the test platform was tested; and the acceleration versus time data and natural vibration frequency were obtained.
对波流力作用下连接及未连接平台的钢管桩进行了测试,获得了加速度时程曲线以及钢管桩固有频率。
The wave force on the steel-pipe pile which was connected and unconnected to the test platform was tested; and the acceleration versus time data and natural vibration frequency were obtained.
对波流力作用下连接及未连接平台的钢管桩进行了测试,获得了加速度时程曲线以及钢管桩固有频率。
应用推荐