• The wave force on the steel-pipe pile which was connected and unconnected to the test platform was tested; and the acceleration versus time data and natural vibration frequency were obtained.

    对波流力作用下连接及未连接平台的钢管桩进行了测试,获得了加速度时程曲线以及钢管桩固有频率。

    youdao

  • The wave force on the steel-pipe pile which was connected and unconnected to the test platform was tested; and the acceleration versus time data and natural vibration frequency were obtained.

    对波流力作用下连接及未连接平台的钢管桩进行了测试,获得了加速度时程曲线以及钢管桩固有频率。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定