So the study of the fly ash carbon forecast technique is very essential and important.
因此,对飞灰含碳量预测技术的研究是非常必要也是很有应用价值的。
Based on forecast technique the time control models are built in the equipment engineering supervision. Then a novel method is proposed for the time control boundary.
文章基于预测技术,建立了设备工程进度控制的模型,并提出了设备工程进度目标控制界限的确定方法。
A feasible weather forecast technique based on the characteristics of the actual situation of the travel site is developed according to the observed data and the meteorological and climatic theories.
从旅游景区的特点出发,采用气候资料,结合天气学与气候学原理,探索了既切合实际又具有可操作性的景区天气预报技术。
Based forecast technique the quality control models are built in the equipment engineering supervision. Then a novel method is proposed for the quality control boundary.
基于预测技术,建立了设备工程质量控制的模型,并提出了设备工程质量目标控制界限的确定方法。
Based forecast technique the quality control models are built in the equipment engineering supervision. Then a novel method is proposed for the quality control boundary.
基于预测技术,建立了设备工程质量控制的模型,并提出了设备工程质量目标控制界限的确定方法。
应用推荐