• Based on forecast technique the time control models are built in the equipment engineering supervision. Then a novel method is proposed for the time control boundary.

    文章基于预测技术,建立了设备工程进度控制的模型,并提出了设备工程进度目标控制界限的确定方法。

    youdao

  • A feasible weather forecast technique based on the characteristics of the actual situation of the travel site is developed according to the observed data and the meteorological and climatic theories.

    从旅游景区的特点出发,采用气候资料,结合天气学与气候学原理,探索了既切合实际又具有可操作性的景区天气预报技术。

    youdao

  • Based forecast technique the quality control models are built in the equipment engineering supervision. Then a novel method is proposed for the quality control boundary.

    基于预测技术,建立了设备工程质量控制的模型,并提出了设备工程质量目标控制界限的确定方法。

    youdao

  • Based forecast technique the quality control models are built in the equipment engineering supervision. Then a novel method is proposed for the quality control boundary.

    基于预测技术,建立了设备工程质量控制的模型,并提出了设备工程质量目标控制界限的确定方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定