• Product Engineering change activity.

    产品工程变更。

    youdao

  • The presented scenario shows collaboration in the context of engineering change order.

    视频展示了在工程变更单情景下的协作。

    youdao

  • The Research of Engineering Change Management in Collaborative Working Environment;

    有利于解决问题的工作环境;

    youdao

  • Engineering change management. To register EC No. , track status and record the document.

    负责工程变更编号的发放与管理,工程变更的状态跟踪及文件存档;

    youdao

  • Defines and issues alterations of parts and part lists according to Engineering Change Requests.

    根据工程变更申请定义和发布零件及零件清单。

    youdao

  • Approve all technical changes (BCP internal), Follow up and sometimes approve Engineering change.

    批准所有技术变更(BCP内部),跟踪和有时批准工程变更。

    youdao

  • Cost effectively enhance paperless reporting for manufacturing, nonconformances and Engineering Change management.

    低成本地增强制造过程、不合格品和工程变更管理的无纸化报告;\ n ?

    youdao

  • Abstract: the rules of the engineering change in Contract law are not congruent with the theory and practice of that.

    [摘要]合同法与学说及实务对工程变更的观点不尽一致。

    youdao

  • Fabric provides a business process for specifying and deciding on engineering change requests (ECRs) at the engineering change phase.

    Fabric提供一个业务流程以在工程变更阶段指定和选定工程变更请求(ECRs)。

    youdao

  • Therefore, from the perspective of risk management, contractor should pay attention to risk management in the engineering change.

    因此,需要承包商从风险管理的角度出发,重视工程变更中的风险管理。

    youdao

  • Abstract: in the process of project construction, because all sorts of reasons, engineering change situation happen from time to tome.

    摘要:在工程建设过程中,由于各种原因,工程变更的情况时有发生。

    youdao

  • The paper explains the cause of expressway engineering change, and presents the measures to control the expressway engineering change.

    通过对高速公路工程变更的原因进行分析,提出了一些控制高速公路工程变更的对策、措施。

    youdao

  • Engineering Dept. must inform each engineering change with formal documents to Quality Dept. Production Dept. and Material Dept. timely.

    每一个工程技术更改必须由技术部以正式的文件及时通知质量,生产,材料部门。

    youdao

  • Built and maintain BOM (bill of material) for new product and update it in case of engineering change or other requirement by related dept.

    进行新产品BOM(物料清单)表的建立与维护,根据工程变更或相关部门要求进行更新。

    youdao

  • Engineering change management, which is basis on product data management (PDM) system, controls the pre-released and released product data.

    建立在产品数据管理系统基础上的工程变更管理是指管理处于预发布和发布生命周期状态的产品数据。

    youdao

  • Own product ECR and ECO for yield improvement, quality improvement and customer requirement. Review and approve owned product engineering change.

    负责产品ECR与ECO,以满足产品良率提升、品质提升和客户需求。

    youdao

  • In the project construction, most risks come from engineering change, while contractors play an important position in the whole construction process.

    项目施工中,很多风险都来自于工程变更,而承包商在整个施工过程中占有很重要的位置。

    youdao

  • Based on modern information economics, dissymmetry information phenomenon between main bodies of project and its influences on engineering change risks are analyzed.

    运用现代信息经济学的信息不对称理论分析了建设项目主体之间的信息不对称现象及其对工程变更风险的影响。

    youdao

  • Receiving engineering change information and operating accordingly in material management system to reflect the change information (part level/usage/structure, etc).

    接收工程师在工程发布系统中的指令,在物料系统中进行操作,如实反映变更的信息(零件级别、用量,结构等)。

    youdao

  • During the long period, It is believed that the mainly reason is the engineering change which results in schedule delay and cost overruns of the construction project.

    在这个较长的建设周期内,工程变更被认为是导致项目工期延迟和费用超支的主要原因,在工程建设项目管理过程中倍受重视。

    youdao

  • Software maintenance is framed by fundamental Agile concepts: working from a backlog of prioritized tickets or engineering change orders, and delivering incremental releases of working software.

    软件维护被基本的敏捷概念所包裹:从优先考虑的候选库中开始工作,或者改变次序,并且交付工作软件的增量发布。

    youdao

  • Construction organizations should recognize the importance of engineering change, arrange high-quality personnel, and use strategies in reason to implement the work of engineering change well.

    施工单位应认识到工程变更的重要性,安排高素质人员,合理运用策略,做好工程变更工作。

    youdao

  • Abstract:First, based on the incomplete contract theory, summarizes the main factors of difference of quantities that including the engineering change, List missing item and quantity deviation.

    摘要:首先,基于不完全契约理论,总结引起工程量差异的工程量清单缺项、工程变更等主要因素;

    youdao

  • By analyzing the risk factors in the engineering change process of the automotive components, this paper establishes the analysis models of the risk factors in the engineering change processes.

    深入分析了汽车零部件产品工程更改风险因素,建立了工程更改风险因素分析模型。

    youdao

  • We need to change the way we teach engineering to make it an enjoyable experience for students.

    我们需要改变教授工程学的方式,让它成为学生们一次愉快的经历。

    youdao

  • During the Engineering stage we try to avoid burdening the users with change control procedures.

    在工程阶段期间,我们试图避免通过改变控制程序加重用户的负担。

    youdao

  • Change control management allows for flexibility, and at the same time, promotes disciplined engineering principles.

    更改控制管理可以提供灵活性,同时有助于实现严谨的工程原则。

    youdao

  • As we have noted, a challenge of working in software engineering is the need to respond to constant change.

    正如我们曾提到的,软件工程师工作的挑战之一是需要对不断发生的变化做出响应。

    youdao

  • It's important to get this work done before we start coding, because it's very disruptive to change engineering processes mid-stream.

    在开始编码之前这个是很重要的。因为在工程进度的中间做改变,是非常具有破坏性的。

    youdao

  • It's important to get this work done before we start coding, because it's very disruptive to change engineering processes mid-stream.

    在开始编码之前这个是很重要的。因为在工程进度的中间做改变,是非常具有破坏性的。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定