• A zone partitioning technique for the calculational area was developed to apply different time steps in different areas during the solidification simulation.

    对不同的计算区域采用不同的时间步长进行计算,建立了分区域计算方法。建立了基于分数步长法的隐式差分方法。

    youdao

  • According to the theory of grey system, the different time steps model of GM (1 1) in the pile foundation engineering is established, and a testing method of this model is provided.

    根据灰色系统理论,首次建立了时间非等步长的桩基工程GM(1 1)模型,提出了时间非等步长的桩基工程GM(1 1)模型的检验方法。

    youdao

  • According to the theory of grey system, the different time steps model of GM (1 1) in the pile foundation engineering is established, and a testing method of this model is provided.

    根据灰色系统理论,首次建立了时间非等步长的桩基工程GM(1 1)模型,提出了时间非等步长的桩基工程GM(1 1)模型的检验方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定