• Earth dam consists of shallow sand and is located between the plant and the overflow dam. It is 2800 meters long and 600 meters wide.

    土坝由浅沙筑成,长2800米,宽600米,位于电厂与溢流堰之间。

    youdao

  • Much of seepage paths is fracture network in rock mass surrounding dam. It is difficult to solve this seepage problem in fracture network by using continuum model.

    大坝周围岩体的渗流通道大多为裂隙网络,用连续介质渗流模型难以解决这一问题。

    youdao

  • From comparison with the rolled dam, it showed that hydraulic dredging and back_filling technique is worthy of popularization.

    通过与碾压坝的对比表明,水力冲填技术有推广应用价值。

    youdao

  • The results provide basic data of cement-soil used for seepage prevention of irrigation canal and shield or cushion of silt-dam. It helps the spreading of the use of this low-price local material.

    为水泥土在西北地区的渠道防渗、过水土坝护面与垫层等方面的应用提供了基本的技术资料,有利于这种价格低廉的地方性建筑材料的推广使用。

    youdao

  • The concrete face slab as the water barrier of rockfill dam, it is very crucial in the overall design of rockfill dam with concrete face slab.

    面板作为面板堆石坝的挡水结构,在面板堆石坝设计中占有重要地位。

    youdao

  • The concrete face slab as the water barrier of rockfill dam, it is very crucial in the overall design of rockfill dam with concrete face slab.

    面板作为面板堆石坝的挡水结构,在面板堆石坝设计中占有重要地位。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定