Earth dam consists of shallow sand and is located between the plant and the overflow dam. It is 2800 meters long and 600 meters wide.
土坝由浅沙筑成,长2800米,宽600米,位于电厂与溢流堰之间。
Much of seepage paths is fracture network in rock mass surrounding dam. It is difficult to solve this seepage problem in fracture network by using continuum model.
大坝周围岩体的渗流通道大多为裂隙网络,用连续介质渗流模型难以解决这一问题。
From comparison with the rolled dam, it showed that hydraulic dredging and back_filling technique is worthy of popularization.
通过与碾压坝的对比表明,水力冲填技术有推广应用价值。
The results provide basic data of cement-soil used for seepage prevention of irrigation canal and shield or cushion of silt-dam. It helps the spreading of the use of this low-price local material.
为水泥土在西北地区的渠道防渗、过水土坝护面与垫层等方面的应用提供了基本的技术资料,有利于这种价格低廉的地方性建筑材料的推广使用。
The concrete face slab as the water barrier of rockfill dam, it is very crucial in the overall design of rockfill dam with concrete face slab.
面板作为面板堆石坝的挡水结构,在面板堆石坝设计中占有重要地位。
The concrete face slab as the water barrier of rockfill dam, it is very crucial in the overall design of rockfill dam with concrete face slab.
面板作为面板堆石坝的挡水结构,在面板堆石坝设计中占有重要地位。