This paper proposes a fault simulation method called Critical Path Tracing of Multi-Fault Information Flag.
提出了一种故障模拟方法——多故障信息标志的临界路径跟踪。
The strategy of critical path tracing is described in detail and it is ensured that all testable faults in the circuit can be detected by the tests generated in this manner.
文中详细叙述了临界路径跟踪的策略,保证求得的测试集能覆盖电路中全部可测故障。
A new combinational fault simulator, PARCRIPT, which combines the merits of the concept of the parallel fault simulation and the efficiency of the critical path tracing (CRIPT), is presented.
本论文提出一快速的组合电路错误模拟器,此错误模拟器结合了并行错误模拟与临界路径追纵方法的优点。
A new combinational fault simulator, PARCRIPT, which combines the merits of the concept of the parallel fault simulation and the efficiency of the critical path tracing (CRIPT), is presented.
本论文提出一快速的组合电路错误模拟器,此错误模拟器结合了并行错误模拟与临界路径追纵方法的优点。
应用推荐