go top

critical path tracing

  • 追踪要径;临界路径跟踪

网络释义专业释义

  追踪要径

... 要径测试产生 critical path test generation 追踪要径 critical path tracing 关键部分优先 critical piece first ...

基于8个网页-相关网页

短语

critical path tracing method 临界路径跟踪法

pseudo critical path tracing 伪临界路径跟踪法

  • 追踪要径
  • 追踪要径

·2,447,543篇论文数据,部分数据来源于NoteExpress

双语例句

  • This paper proposes a fault simulation method called Critical Path Tracing of Multi-Fault Information Flag.

    提出了一种故障模拟方法——多故障信息标志的临界路径跟踪。

    youdao

  • The strategy of critical path tracing is described in detail and it is ensured that all testable faults in the circuit can be detected by the tests generated in this manner.

    文中详细叙述了临界路径跟踪的策略,保证求得的测试集能覆盖电路中全部可测故障。

    youdao

  • A new combinational fault simulator, PARCRIPT, which combines the merits of the concept of the parallel fault simulation and the efficiency of the critical path tracing (CRIPT), is presented.

    本论文提出一快速的组合电路错误模拟器,此错误模拟器结合了并行错误模拟与临界路径追纵方法的优点。

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定