Geological exploration projects are different from ordinary construction projects, especially on larger cost control difficulty.
地质勘查项目不同于一般建设项目,成本控制难度较大。
The control difficulty points of drum water level, three parameters system structure of boiler water level system, control strategy choosing and control algorithm of HSIC were studied.
研究了汽包液位控制的难点、锅炉水位三冲量系统结构、控制策略选取及HSIC控制算法。
The control difficulty points of drum water level, three parameters system structure of boiler water level system, control strategy choosing and control algorithm of HSIC were studied.
研究了汽包液位控制的难点、锅炉水位三冲量系统结构、控制策略选取及HSIC控制算法。
应用推荐