• Geological exploration projects are different from ordinary construction projects, especially on larger cost control difficulty.

    地质勘查项目不同于一般建设项目,成本控制难度较大。

    youdao

  • The control difficulty points of drum water level, three parameters system structure of boiler water level system, control strategy choosing and control algorithm of HSIC were studied.

    研究了汽包液位控制的难点、锅炉水位三冲量系统结构、控制策略选取及HSIC控制算法。

    youdao

  • The control difficulty points of drum water level, three parameters system structure of boiler water level system, control strategy choosing and control algorithm of HSIC were studied.

    研究了汽包液位控制的难点、锅炉水位三冲量系统结构、控制策略选取及HSIC控制算法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定