• Every month we shall establish construction schedule.

    每个月我们都要制订建设进度计划。

    youdao

  • The construction schedule was plagued by the bad weather.

    天气恶劣使工程进度受阻。

    youdao

  • The construction schedule is only a plan, which always has risk.

    施工进度计划只是一个计划,总存在风险。

    youdao

  • The construction schedule and methods of the latter system were put forward.

    提出了干挂石材墙面采用现浇聚氨酯保温隔热系统的施工程序及方法。

    youdao

  • So it looks very important to study the controlment of construction schedule.

    因此对施工进度控制问题的探讨就显得尤为重要。

    youdao

  • Our major planning items contain estimating of cost and construction schedule.

    我们主要的计划工作项目包括费用预算和施工进度。

    youdao

  • The automation would decrease driver's fatigue and speed up construction schedule.

    通过自动操纵,减轻了驾驶员的作业强度,加快了施工进度。

    youdao

  • These meetings should include reviewing and updating the construction schedule and the cost estimates.

    这些会议应当包括回顾和更新施工进度和成本预算。

    youdao

  • In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.

    工程施工进度风险分析计算是施工进度控制中的重要环节。

    youdao

  • Other work must be centered on the construction schedule to adapt to the requirements of the arrangements.

    施工中的其他工作必须围绕着并适应施工进度计划的要求安排。

    youdao

  • These projects were based around and driven by the construction schedule for the buildings, a very sequential process.

    这些项目工作是由建筑物的施工进度驱动的,是一个非常有序的过程。

    youdao

  • Construction schedule will be issued when accurate dates for Drawings, OFE's is known and after (Builder) as finalised all procurement.

    生产进度表将根据图纸上精确的时间进行编制。所有船厂采购物品确定后,明确船东供品。

    youdao

  • This method has the obvious effect to ensure the construction safety, speed up the construction schedule and reduce the construction cost.

    该方法在确保施工安全、加快施工进度、降低施工成本方面具有显著的效果。

    youdao

  • In roadbed construction, excessive soil is used to fill subgrade because of weather and construction schedule constraints and other reasons.

    在公路路基施工中,天气及施工工期的限制等原因,会经常遇到采用过湿土填筑路基的情况。

    youdao

  • The groundwater inflow into a tunnel affects not only the construction schedule, cost, stability and safety, but also the groundwater level.

    隧道涌水不但影响施工进度、施工费用、稳定和安全,也会引起地下水位的下降。

    youdao

  • The Augustine panel questioned the cost, design and construction schedule of the rocket in a report submitted to the White House for consideration.

    奥古斯汀专项研究小组质疑提交给白宫考虑的报告中的成本、设计以及建设计划。

    youdao

  • Therefore, in the management of modern construction projects, it is becoming an important work to control and manage the construction schedule.

    因此,在现代施工项目管理中,对工程进度的控制和管理成为一项极为重要的工作。

    youdao

  • Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.

    编制工程进度月计划、周计划以控制阶段工期的如期完成。

    youdao

  • The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described.

    介绍了P 3软件的功能和特点以及在某抽水蓄能电站工程施工进度计划编制中的应用过程及成果。

    youdao

  • Standard brick upon the occurrence of these problems, construction will be disrupted, serious impact on the building construction schedule and project quality.

    标砖一旦发生这些问题,施工将被打乱,严重影响建筑物的施工进度和工程质量。

    youdao

  • It may be used to adjust and optimize construction schedule planning, also manage production and control construction schedule in construction controlling stage.

    在编制计划时可以很方便地调整、优化施工进度计划,在施工控制阶段,可以直接指挥生产,控制施工进度。

    youdao

  • Composition, installation procedure and features, construction schedule and quality control and inspection of sulphur-burning sulphuric acid plants are reviewed.

    介绍了硫磺制酸装置的组成、安装工艺及特点、施工进度计划和质量控制检查。

    youdao

  • In that case, ensuring the construction term of the construction schedule reasonably and impersonally would be the guarantee of the whole construction procedure.

    如何科学、客观地确定施工进度计划中各分部、分项工程的持续时间是施工进度计划具有合理性和可行性的保证。

    youdao

  • Template processes in many cases network diagram of the construction of the key lines, Process Improvement template can often speed up the construction schedule.

    模板工序在许多情况下是施工网络图中的关键线路,模板工艺的改进常常可以加快施工进度。

    youdao

  • In the construction of the centralized control station, the traditional remote control test method is hard to comply with the requirement of construction schedule.

    在集控站建设中,传统的遥控试验方法难以满足建设工期的要求。

    youdao

  • In the construction of highway, the construction organization of through cut and the construction quality will influence the construction schedule and slope stability.

    在公路建设中,路堑开挖施工组织是否合理、施工质量如何,将影响施工进度和边坡的稳定。

    youdao

  • The concreting work of the 4 flaring piers was done simultaneously, which satisfied the requirements of both construction schedule and safely tiding over the flood period.

    居甫渡水电站大坝溢流坝段4个中墩为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工,满足了施工进度计划和安全度汛节点工期的要求。

    youdao

  • In the construction process of the old people's home of Nansan, we seek after some methods to control the construction schedule better together with the construction unit.

    结合青岛市福彩南山养老院工程,与施工单位共同对如何做好进度控制工作进行了一些探索。

    youdao

  • In the construction process of the old people's home of Nansan, we seek after some methods to control the construction schedule better together with the construction unit.

    结合青岛市福彩南山养老院工程,与施工单位共同对如何做好进度控制工作进行了一些探索。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定