These projects were based around and driven by the construction schedule for the buildings, a very sequential process.
这些项目工作是由建筑物的施工进度驱动的,是一个非常有序的过程。
The Augustine panel questioned the cost, design and construction schedule of the rocket in a report submitted to the White House for consideration.
奥古斯汀专项研究小组质疑提交给白宫考虑的报告中的成本、设计以及建设计划。
It proves that construction schedule, quality and safety goals can be reached with DOKA formwork system, and project cost can be reduced.
实践证明,DOKA大模板系统可保证施工进度、质量、安全,并可节约成本。
Therefore, in the management of modern construction projects, it is becoming an important work to control and manage the construction schedule.
因此,在现代施工项目管理中,对工程进度的控制和管理成为一项极为重要的工作。
These meetings should include reviewing and updating the construction schedule and the cost estimates.
这些会议应当包括回顾和更新施工进度和成本预算。
In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.
工程施工进度风险分析计算是施工进度控制中的重要环节。
Other work must be centered on the construction schedule to adapt to the requirements of the arrangements.
施工中的其他工作必须围绕着并适应施工进度计划的要求安排。
This method has the obvious effect to ensure the construction safety, speed up the construction schedule and reduce the construction cost.
该方法在确保施工安全、加快施工进度、降低施工成本方面具有显著的效果。
In roadbed construction, excessive soil is used to fill subgrade because of weather and construction schedule constraints and other reasons.
在公路路基施工中,天气及施工工期的限制等原因,会经常遇到采用过湿土填筑路基的情况。
The groundwater inflow into a tunnel affects not only the construction schedule, cost, stability and safety, but also the groundwater level.
隧道涌水不但影响施工进度、施工费用、稳定和安全,也会引起地下水位的下降。
Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.
编制工程进度月计划、周计划以控制阶段工期的如期完成。
The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described.
介绍了P 3软件的功能和特点以及在某抽水蓄能电站工程施工进度计划编制中的应用过程及成果。
It may be used to adjust and optimize construction schedule planning, also manage production and control construction schedule in construction controlling stage.
在编制计划时可以很方便地调整、优化施工进度计划,在施工控制阶段,可以直接指挥生产,控制施工进度。
Composition, installation procedure and features, construction schedule and quality control and inspection of sulphur-burning sulphuric acid plants are reviewed.
介绍了硫磺制酸装置的组成、安装工艺及特点、施工进度计划和质量控制检查。
Template processes in many cases network diagram of the construction of the key lines, Process Improvement template can often speed up the construction schedule.
模板工序在许多情况下是施工网络图中的关键线路,模板工艺的改进常常可以加快施工进度。
In the construction of the centralized control station, the traditional remote control test method is hard to comply with the requirement of construction schedule.
在集控站建设中,传统的遥控试验方法难以满足建设工期的要求。
In the construction of highway, the construction organization of through cut and the construction quality will influence the construction schedule and slope stability.
在公路建设中,路堑开挖施工组织是否合理、施工质量如何,将影响施工进度和边坡的稳定。
The concreting work of the 4 flaring piers was done simultaneously, which satisfied the requirements of both construction schedule and safely tiding over the flood period.
居甫渡水电站大坝溢流坝段4个中墩为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工,满足了施工进度计划和安全度汛节点工期的要求。
In the construction process of the old people's home of Nansan, we seek after some methods to control the construction schedule better together with the construction unit.
结合青岛市福彩南山养老院工程,与施工单位共同对如何做好进度控制工作进行了一些探索。
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
With careful monitoring, considering the accordance of the construction schedule and the loading speed, the reclaiming process is integrated with the treatment of soft soil in this case.
该工程的特点是在严密的监测下,吹填进度和加荷速度一并考虑,围海造陆过程与软基处理过程融为一体。
Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.
施工设计包括:清单工程量计算、工程量清单报价(商务标)、施工技术标、施工进度计划及施工平面图的编制。
In light of the construction difficulty during building a long tunnel in soft rock mass, the 3d numerical simulation is used to analyze the construction schedule of the Changliangshan tunnel.
针对长梁山隧道软弱围岩段的施工难题,采用三维数值模拟手段对施工过程进行了计算分析。
Combining with previous studies and the test results, suggestion was proposed that both construction schedule and working load should be controlled during the construction of masonry buildings.
结合以往的研究经验及本次试验总结的规律,得出了对砌体结构房屋的施工进度及施工荷载应当加以控制的结论。
How to improve the construction quality of air cooled platform, speed up the air cooled platform construction schedule, will become the important research topic of power plant construction company.
如何在施工中提高空冷平台施工质量,加快空冷平台施工进度,成为电建施工单位一个重要的研究课题。
Selecting and applying of the scaffoldings influences directly on the safety of construction, and at the same time it will also affect the work quality, construction schedule and company' s benefit.
脚手架选择与使用直接影响施工作业的安全,也关系到工程质量、施工进度和公司经济效益的提高。
The practical construction control procedure of concrete dam construction schedule and quality is brought out based on theory of cybernetics. The scheduling and quality monitoring model is proposed.
根据控制论的基本原理,建立了混凝土坝施工进度与质量实时控制的流程,研究了混凝土坝施工进度与质量实时预警模型。
Therefore, it has strong realistic meaning and a certain theory value to study on construction-schedule early-warning model of waterlocks key project.
因此,水闸枢纽工程施工进度预警模型研究具有很强的现实意义和一定的理论价值。
Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.
在上述研究基础上,制定了具体的风险应对工程措施和非工程措施,有效控制了DS水闸枢纽工程进度风险。
Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.
在上述研究基础上,制定了具体的风险应对工程措施和非工程措施,有效控制了DS水闸枢纽工程进度风险。
应用推荐