• Through joint debugging and commissioning of systems, a range of technical performances, like safety, reliability and stability of the design of all rail transit systems, are tested and evaluated.

    通过系统联调联试工作,测试评价轨道交通各系统设计安全性可靠性平稳性一系列技术性能

    youdao

  • And commissioning follows no load debugging of every system as main reducer lubrication system, roller mill pressure station and roller lubrication system.

    负荷试运行阶段,主要探索使系统稳定运行系统风量、磨机压差、入磨气体压力等工艺参数的控制。

    youdao

  • And commissioning follows no load debugging of every system as main reducer lubrication system, roller mill pressure station and roller lubrication system.

    负荷试运行阶段,主要探索使系统稳定运行系统风量、磨机压差、入磨气体压力等工艺参数的控制。

    youdao