• Through joint debugging and commissioning of systems, a range of technical performances, like safety, reliability and stability of the design of all rail transit systems, are tested and evaluated.

    通过系统联调联试工作,测试、评价轨道交通各系统设计的安全性、可靠性、平稳性等一系列技术性能。

    youdao

  • And commissioning follows no load debugging of every system as main reducer lubrication system, roller mill pressure station and roller lubrication system.

    磨机负荷试运行阶段,主要探索使系统稳定运行的系统风量、磨机压差、入磨气体压力等工艺参数的控制。

    youdao

  • And commissioning follows no load debugging of every system as main reducer lubrication system, roller mill pressure station and roller lubrication system.

    磨机负荷试运行阶段,主要探索使系统稳定运行的系统风量、磨机压差、入磨气体压力等工艺参数的控制。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定