Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.
查龙电站面板堆石坝坝体及沙砾石副坝填筑体按不同填筑区填筑沙砾石料。
After check and assessment, construction quality for embankment dam with concrete face slab material filling at chalong Hydropower Station is excellent.
经检查评定查龙水电站面板坝填筑施工质量属优良水平。
Chalong Hydropower station is located in high elevation and severely cold area. The geographic position and environment influence the electrical equipment at the power station.
查龙水电站地处高海拔、高寒地区,电站的地理位置和环境对电站的电器设备有影响。
Chalong Hydropower station is located in high elevation and severely cold area. The geographic position and environment influence the electrical equipment at the power station.
查龙水电站地处高海拔、高寒地区,电站的地理位置和环境对电站的电器设备有影响。
应用推荐