• Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.

    查龙电站面板堆石坝坝体砾石副坝填筑不同填筑填筑沙砾石料。

    youdao

  • After check and assessment, construction quality for embankment dam with concrete face slab material filling at chalong Hydropower Station is excellent.

    检查评定查龙水电站面板填筑施工质量优良水平。

    youdao

  • Chalong Hydropower station is located in high elevation and severely cold area. The geographic position and environment influence the electrical equipment at the power station.

    查龙水电站地处海拔、高寒地区电站地理位置环境电站的电器设备有影响。

    youdao

  • Chalong Hydropower station is located in high elevation and severely cold area. The geographic position and environment influence the electrical equipment at the power station.

    查龙水电站地处海拔、高寒地区电站地理位置环境电站的电器设备有影响。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定