• The first two lines of assembly code at B0 and B5 load the instance reference from memory location 049388C8 into eax and test for null.

    B0B5 处汇编代码将 instance引用内存位置 049388C8 加载eax 中进行 null 检查。

    youdao

  • After performing the shorts and opens test the in-circuit tester tests each component on a PCB assembly one at a time.

    短路、开路测试完成以后在线测试仪需要在同一时间印刷电路板上的一个器件进行测试

    youdao

  • At present, the hydraulic transmission box test-bed has been applied for the assembly line as a standard measuring equipment and is playing a very important role.

    目前变速箱测试台作为一种标准测试设备使用生产装配线上发挥着重要的作用。

    youdao

  • An example would be if two users start test runs and also request code coverage data from the same assembly at the same time.

    例如两个使用者启动测试回合同一时间同一个组件要求程序码涵盖范围资料

    youdao

  • I pneumatic leak test at a pressure of not less than 6 bar after assembly of all tank valves and fittings.

    气阀配件装配少于6压力气压测漏报告。

    youdao

  • I pneumatic leak test at a pressure of not less than 6 bar after assembly of all tank valves and fittings.

    气阀配件装配少于6压力气压测漏报告。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定