The first two lines of assembly code at B0 and B5 load the instance reference from memory location 049388C8 into eax and test for null.
B0和B5 处的前两行汇编代码将 instance引用从内存位置 049388C8 加载至eax 中,并进行 null 检查。
After performing the shorts and opens test the in-circuit tester tests each component on a PCB assembly one at a time.
短路、开路测试完成以后,在线测试仪需要在同一时间对印刷电路板上的每一个器件进行测试。
At present, the hydraulic transmission box test-bed has been applied for the assembly line as a standard measuring equipment and is playing a very important role.
目前,变速箱测试台已作为一种标准的测试设备被使用在生产装配线上并发挥着重要的作用。
An example would be if two users start test runs and also request code coverage data from the same assembly at the same time.
例如,有两个使用者启动测试回合,也在同一时间从同一个组件要求程序码涵盖范围资料。
I pneumatic leak test at a pressure of not less than 6 bar after assembly of all tank valves and fittings.
气阀及配件装配后不少于6巴压力的气压测漏报告。
I pneumatic leak test at a pressure of not less than 6 bar after assembly of all tank valves and fittings.
气阀及配件装配后不少于6巴压力的气压测漏报告。
应用推荐