• 根据已经确定的施工进度计划安排拉西大坝2008年底具备下闸蓄水条件

    The Laxiwa dam will be in a condition for reservoir impoundment at the end of the year 2008 in accordance with the fixed progress schedule.

    youdao

  • 同样PM生命周期中的各种事件都需要有事件过程中以及事件完成之后计划进度安排支持工作

    Likewise, various "events" within the PM lifecycle require planning, scheduling, and supporting work during and after the completion of the event.

    youdao

  • 项目经理建立第一个迭代的项目计划安排方法集成项目资源定期所有涉众报告进度

    The project manager creates a first iteration project plan and arranges the resources for the methodology integration project, reporting on progress regularly to all stakeholders.

    youdao

  • 可以调查趋势学习如何计划的时规划实际比较应该能够改进您的项目计划时间进度安排

    You can examine trends, and should be able to improve your project planning and scheduling as you learn how your projected timeframes compare to actuals.

    youdao

  • 我们更倾向相信谨慎安排计划排得紧凑进度开发软件时的唯一途径

    We tend to believe that a carefully laid-out plan and tight schedule is the only way to develop a new piece of software.

    youdao

  • 施工中的其他工作必须围绕着并适应施工进度计划要求安排

    Other work must be centered on the construction schedule to adapt to the requirements of the arrangements.

    youdao

  • 电机传动料件测试评估做出计划安排进度

    Plan and schedule qualification tests for each motor or gear component.

    youdao

  • 总之计划不断变化环境下较高灵活安排生产进度表、监督更新交货状态

    Focus is be able to maintain a highly flexible production schedule and watch and update delivery statues in a continuously changing environment.

    youdao

  • 项目管理就是项目活动计划进度安排控制监督沟通激励

    Project management includes planning for the project and the schedule, controlling, supervising, communicating and encouraging when the project is on-going.

    youdao

  • 灵活进度安排——版本交付可能可能最初计划时间。

    Flexible schedule - the deliverable may be required sooner or later than initially planned.

    youdao

  • 平衡客户需求工厂产能优化生产计划安排追踪生产进度确保水平出货达成率并维持分销中心合理库存(FDS)。

    Leverage customer demand and plant production capacity. Optimize production plan and track production execution to ensure high delivery compliance performance and suitable DC inventory (FDS).

    youdao

  • 编制生产部生产计划合理安排生产,跟进生产进度

    Compile the planning of product, arrangement of production reasonably, follow the production pace.

    youdao

  • 为了降低进度安排不当导致项目实施失败风险将时间约束网络应用项目实施进度计划研究

    To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.

    youdao

  • 计划根据生产耳目力,物料环境安排试产,并催生产的进度

    Planner will arrange pilot run schedule based on manpower and material, will coordinate with MFG to finish pilot on time.

    youdao

  • 最后引入功能点分析模型系统构建初期分析系统功能复杂程度,从而项目计划进度安排提供有力的依据。

    Finally the paper measure how system's complexity is by Function Points Model at the beginning of the project to help project designer and developer carry on reasonable plan and time phasing.

    youdao

  • 负责进度 计划要求合理安排各项工作;

    Make reasonable plan for various parts in accordance with the progress schedule.

    youdao

  • 属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排进度中,估算费用监视控制

    The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.

    youdao

  • 善于制定计划明确学习任务:要根据进度自己的学习状况安排计划使自己清楚地意识到每天必须要完成的学习任务。

    Two, be good at planning, explicit learning task: according to the study progress and their learning situation to plan, make themselves aware of every day to complete the learning tasks.

    youdao

  • 项目进度计划安排项目人员的设置在项目管理非常重要作用

    The arrangement of the Project Schedule and allocation of the project staffing play a very important role in the PM.

    youdao

  • 制定安排相关工作进度计划表。

    Formulate and arrange related job schedule planning report.

    youdao

  • 制定安排相关工作进度计划表。

    Formulate and arrange related job schedule planning report.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定