本文提出用砖模代替木模的方法用于沉井工程中刃脚部分的施工的理论。
This paper brings forward a new construction method that brick model has been used to replace wood model in blade feet part sinking well engineering.
本发明涉及一种沉井工程最终高程控制方法。本发明属于沉井工程技术领域。
The invention relates to a final elevation control method for open caisson construction, belonging to the technical field of open caisson construction.
所述计算原则和方法也适用于分析截水槽、倒挂井、沉井及其他土石开挖工程在施工期的稳定性。
The presented computation methods are also applicable to stability analysis of catch drain, impended wall, open caisson and other excavation works during construction.
它主要用于测量桩基钻孔的井径与井筒偏斜,也可用于帷幕、沉井井筒测量以及海岸工程、岩盐水溶开采的井下溶腔测量等。
Besides the diameter and inclination of pile foundation drill-hole, it can also be applied to other engineering, such as segmentation sinking, caisson sinking and halite mining by water-solution.
本文对海洋工程中沉井这一结构物在波浪中的运动估算和结构设计提供了有效手段。
For the estimate of motions in waves and structural design of the caisson in the field of ocean engineering, the present paper is of particular significance.
超型深水沉井是当代大型水电、水运、桥梁深基础工程的主要结构型式。
At present, very large deep water open caisson is main structural form of large hydroelectric engineering, water transport engineering and deep foundation works of bridge.
最后用几何优化法对泵房沉井基础的工程费估算作了应用性探讨。
Finally, the original cost estimation of open caisson pump house is made with the geometric optimization.
介绍沉井结构设计的主要问题与施工主要技术措施,认为沉井是湿地工程地基基础的一种有效结构类型。
This paper introduces the main problems of design and technical measure of construction. Sinking well is considered as an effective structure type in marsh project foundation.
沉井是软土地基中深基础施工方法之一,在工程用地与环境条件受到限制或埋深较大的地下构筑物工程中被广泛应用。
Sink well is one of built method in deep foundation of soft groundwork, it is used widely in limited ground and limited environment or in deep burying construction.
对华能玉环电厂1 000MW机组工程的雨水泵房沉井施工作了介绍,包括:地质条件、结构型式和施工准备、顺序、方案。
This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.
对于类似的基坑工程,在不能使用沉井时,可以借鉴该施工方案。
If it cant't use end-open caisson, the experience of the construction plan can be used in similar foundation pit engineering.
张集煤矿西回风井下沉井壁是钻井结束后确保井筒满足投产使用的关键工程。
The wall submersion in the west air shaft of Zhangji Coal Mine, is the key engineering of ensuring the shaft to satisfy production use.
通过总结工程实践,介绍沉井混凝土垫层施工设计实例和结构计算。
Introduced here is a summary of the experience in the construction design and structural calculation of such a bedding.
通过总结工程实践,介绍沉井混凝土垫层施工设计实例和结构计算。
Introduced here is a summary of the experience in the construction design and structural calculation of such a bedding.
应用推荐