本文提出用砖模代替木模的方法用于沉井工程中刃脚部分的施工的理论。
This paper brings forward a new construction method that brick model has been used to replace wood model in blade feet part sinking well engineering.
本发明涉及一种沉井工程最终高程控制方法。本发明属于沉井工程技术领域。
The invention relates to a final elevation control method for open caisson construction, belonging to the technical field of open caisson construction.
所述计算原则和方法也适用于分析截水槽、倒挂井、沉井及其他土石开挖工程在施工期的稳定性。
The presented computation methods are also applicable to stability analysis of catch drain, impended wall, open caisson and other excavation works during construction.
应用推荐