• 文章重点介绍了大型船坞钢板工程施工方法

    This paper mainly introduces the construction methods of steel sheet pile of water sealing wall of large-size dock.

    youdao

  • 地砖之前时间一定要同时要将地漏东西掉下去堵塞

    Wall brick, floor tile in the post, before bubble water must enough time. At the same time will use item floor drain plug well, prevent cement fall blocking drains.

    youdao

  • 筋竖筋分绑扎第一次从底板留出插筋至钢板上口留出,搭接倍数,第二次绑扎至板面

    Two-time-binding is required for vertical re-bar of plank wall. First binding is made up to water stop plate, second binding is made up to top plate surface.

    youdao

  • 角质形成细胞细胞间质形成学说,它们牢固地着与丢失

    Like a wall, keratinocytes and cells interste firmly stick together to prevent water loss.

    youdao

  • 地下连续接头采用预制钢筋接头连接端头辅以深层搅拌加固地基

    The tie in segment of the diaphragm wall is connected using pre reinforced concrete pile. The foundation strata of two shield well is also reinforced by deep mixing piles in order to seal water.

    youdao

  • 地下连续接头采用预制钢筋接头连接端头辅以深层搅拌加固地基

    The tie in segment of the diaphragm wall is connected using pre reinforced concrete pile. The foundation strata of two shield well is also reinforced by deep mixing piles in order to seal water.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定