文章重点介绍了大型船坞止水墙钢板桩工程施工方法。
This paper mainly introduces the construction methods of steel sheet pile of water sealing wall of large-size dock.
墙砖、地砖在贴之前,泡水时间一定要够。同时要将地漏用东西塞好,防止水泥掉下去堵塞下水道。
Wall brick, floor tile in the post, before bubble water must enough time. At the same time will use item floor drain plug well, prevent cement fall blocking drains.
板墙筋竖筋分二次绑扎,第一次从底板留出插筋至止水钢板上口留出,搭接倍数,第二次绑扎至顶板面。
Two-time-binding is required for vertical re-bar of plank wall. First binding is made up to water stop plate, second binding is made up to top plate surface.
应用推荐