• 考虑并行加工机上不同尺寸调度问题目标极小最大完工时间

    The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).

    youdao

  • 使尽量多对应交货时间区间完工排序问题NP困难的。

    The scheduling Problem that maximize the number of jobs completed in due date window is NP - hard.

    youdao

  • 允许机器空闲,寻找一个排序使得最大提前完工时间最小。

    Under the condition of permission the idle insert, a job sequence was determined, which minimize the maximum earliness.

    youdao

  • 我们所考虑目标函数所有加权完工时间之和与对所有工的实际加工时间偏离额定加工时间的最大不满意程度这两部分组成。

    The objective function being considered was the sum of weighted completion times of all jobs plus the maximum dissatisfaction of all jobs processing times that deviated from their specified ones.

    youdao

  • 完成的工按照批次进行送货所有公共交货期完工的工优交货期时间一起交付批次送货没有约束

    Finished jobs are delivered in batches and all the jobs completed before or at the due date are delivered in a batch at the optimal due date. There is no capacity limitation on a batch delivery.

    youdao

  • 讨论这样一类单机排序问题:每个联系一个交货期窗口如果完工时间的交货期窗口内,则该工完工满意的;排序的优化准则是完工满意的工个数最大。

    In this paper, we consider such a scheduling model: a due date window is associated with each job, a job is call satisfying job if its completion time lies in its corresponding due date window.

    youdao

  • 讨论加工时间开工时间线性增加的成组排序问题,考虑目标函数完工时间,在成组技术的限制下,总完工时间问题是多项式时间可解的。

    In these two problems, the job processing time is a linear decreasing function of its starting time, the objective is to minimize the total completion time.

    youdao

  • 讨论加工时间开工时间线性增加的成组排序问题,考虑目标函数完工时间,在成组技术的限制下,总完工时间问题是多项式时间可解的。

    In these two problems, the job processing time is a linear decreasing function of its starting time, the objective is to minimize the total completion time.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定