  • 考虑并行加工机上不同尺寸调度问题目标极小最大完工时间

    The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).

    youdao

  • 使尽量多对应交货时间区间完工排序问题NP困难的。

    The scheduling Problem that maximize the number of jobs completed in due date window is NP - hard.

    youdao

  • 允许机器空闲,寻找一个排序使得最大提前完工时间最小。

    Under the condition of permission the idle insert, a job sequence was determined, which minimize the maximum earliness.