表明本文算法可以用于求解具有复杂约束条件的非线性混联水电站群水库优化调度问题。
The comparison of the optimization result obtained from this algorithm with that obtained from progressive optimization algorithm for an example verifies the effectiveness of this approach.
与传统的机组优化组合方法相比,该方法能方便地处理机组优化组合问题的复杂约束条件。
Comparing with traditional unit optimal commitment method, this method can manage the complicated constraints of unit optimal commitment expediently.
集装箱装入问题是“切割和装入”问题领域中的三维空间问题,是具有复杂约束条件的组合优化问题。
Container loading is the three-dimensional problem in "cutting and packing" problems. It is combined optimization with complex constraint condition.
通过变量代换将问题中的两种耦合关系分解开,使得该问题转化为一个含有复杂约束条件的非线性规划问题。
The two different kinds of combined relations in this problem are de-coupled by variable replacing, and the problem is changed into a non-linear programming problem with complex constraints.
如何准确地确定在电压稳定性等复杂约束条件下的系统输电能力,成为了当今电力系统界所面临的急待解决的研究课题。
How to calculate the power system transmission capability in complicated voltage stability constraint conditions exactly becomes a desirable study problem in the power system nowadays.
轻烃回收系统庞大,工艺流程复杂,约束条件很多,从整个大系统的角度去求解优化问题存在很大困难。
From the view of whole large system, it was difficult to solve optimization problems for light hydrocarbon recovery system because of complex technics flow and constrained conditions.
在为机组组合问题编制算法的过程中,因需要满足错综复杂的约束条件,容易使程序结构混乱、逻辑判断出错,最终导致算法求解失败。
During the programming of the algorithm for the unit commitment problem, the complex constraints often lead the program to bad structure or wrong result.
面对复杂生产过程中的多种时变性、非线性、不确定性、大纯滞后以及各种约束条件,预测控制正在经历不断完善的过程。
Predictive control is being perfected continually in the face of the property of the strong dynamic delay and time-varying nonlinear and many restriction conditions of the complex industry process.
约束可满足性问题是一大类常出现于现实应用中的复杂问题,因其繁多的约束条件而出名。
Constraint satisfaction problems are a large category of complex problems in real world applications, noted for various constraints.
当线性规划约束条件的右端向量在一定范围内变化时,目标函数的最优值是右端向量的一个复杂的分片线性函数,但通常难以给出分析表达式。
The optimal objective value is a complicated piecewise linear function of the right-hand-side vector of the constraints, and its analytical expression is normally hard to obtain.
当考虑到发电机报价曲线的影响时,发电计划偏差优化问题是一个高维、离散、约束条件复杂的非线性最优化问题。
Considering the generators bidding prices curves, the generation scheduling error optimization problem is high dimensional, disperse, complex constrained, non-liner problem.
多泵站多热站决定了输油管道优化运行的目标函数和约束条件的复杂性。
Multi-pump station and multi-heat station make the objective function and constrains of oil pipeline more complicated.
多约束条件下的三维装箱问题是一个复杂的组合优化问题,属于NP-HARD问题,其求解是很困难的。
Three dimension packing problem with multi constraints is a complicated combinatorial optimization, and is NP HARD problem. It is difficult to obtain on optimal solution.
该算法将复杂的非线性优化问题根据不同的优化约束条件,分解为三个求解阶段。
The algorithm decomposes the complex non-linear optimal problem into three courses, according to the different constraints.
安全预评价是一个复杂的技术经济系统工程,其影响因素、关联变量和约束条件复杂。
The safety pre evaluation is a complex technology economic system engineering and it is complex due to influential factors, on relation variables and constraining conditions.
当问题较复杂时,设计了基于GA的求解算法,并给出了约束条件处理和参变量简化的条件和方法。
If the problem is complicated, the algorithms have been designed based on GA, at the same time the methods of dealing with restrict conditions and facilitating variables are provided in paper.
县级电网的电压无功控制问题是一个多约束条件、多变量、非线性的复杂数学规划难题。
Reactive power optimization control in county power system is a great complex nonlinear mathematical programming problem, which has many variables and large constrains.
当今尚待解决的许多复杂大系统的决策问题,涉及因素很多,约束条件也很复杂,出现了大量的不相容问题。
Nowadays, owing to many unresolved decision problems which have a lot of factors and complex condition of constraint, a multitude of contradictory problems appear.
然而,桥台受力情况比桥墩复杂,设计变量与约束条件也较多,故程序也较复杂。
However, the loading conditions, the design variables and the constrained conditions of abutment are more complicated than pier's, also in the program...
此算法实际上是求约束条件下的函数最小值问题,属于组合优化问题,其计算复杂度随着目标数的增加而发生爆炸现象。
This algorithm is actually a minimum problem under the restrict conditions, it belongs to the combined optimization problem and its computing burden increases heavily with the number of targets.
成像卫星调度问题中约束条件数量众多且复杂,战场环境中,快速决策的要求增加了成像卫星任务调度的难度。
Scheduling of Imaging Satellite (IS) involves many complex constraints. In the battle fields, it is difficult to schedule imaging satellites to satisfy the requirement of strategic decision-making.
成像卫星调度问题中约束条件数量众多且复杂,战场环境中,快速决策的要求增加了成像卫星任务调度的难度。
Scheduling of Imaging Satellite (IS) involves many complex constraints. In the battle fields, it is difficult to schedule imaging satellites to satisfy the requirement of strategic decision-making.
应用推荐