表明本文算法可以用于求解具有复杂约束条件的非线性混联水电站群水库优化调度问题。
The comparison of the optimization result obtained from this algorithm with that obtained from progressive optimization algorithm for an example verifies the effectiveness of this approach.
与传统的机组优化组合方法相比,该方法能方便地处理机组优化组合问题的复杂约束条件。
Comparing with traditional unit optimal commitment method, this method can manage the complicated constraints of unit optimal commitment expediently.
集装箱装入问题是“切割和装入”问题领域中的三维空间问题,是具有复杂约束条件的组合优化问题。
Container loading is the three-dimensional problem in "cutting and packing" problems. It is combined optimization with complex constraint condition.
应用推荐