项目建设规模:该项目全长 80.2公里,采用二级公路技术标准。
Project scale: the highway will be 80.2 km long at the second class highway technical standard.
所修建、架设或者埋设的设施应当符合公路工程技术标准的要求。
Facilities being built, erected or laid should conform to technical standards as required by road engineering.
《公路工程技术标准》是指导公路规划和设计纲领性文件。
Highway Engineering Technique Standard is used to guide the highway planning and design.
通过对公路主要技术指标的综合优化,以获得技术标准的最优组合。
Through overall optimization on the main highway technical indicators, the optimum combination of technical.
高速公路平、纵、横设计技术标准相当高,路堑边坡是其最为普遍的内容之一。
The design standard of motorway is very high, especially in plane, vertical and transect face.
所修建、架设或者埋设的设施应当符合公路工程技术标准的要求。
Facilities being built, erected or laid should conform to technical standards as required by...
所修建、架设或者埋设的设施应当符合公路工程技术标准的要求。
Facilities being built, erected or laid should conform to technical standards as required by...
应用推荐