项目建设规模:该项目全长 80.2 公里,采用二级公路技术标准。
Project scale: the highway will be 80.2 km long at the second class highway technical standard.
所修建、架设或者埋设的设施应当符合公路工程技术标准的要求。
Facilities being built, erected or laid should conform to technical standards as required by road engineering.
《公路工程技术标准》是指导公路规划和设计纲领性文件。
Highway Engineering Technique Standard is used to guide the highway planning and design.
应用推荐