With production estimated to take at least two weeks to get back to normal, the test-flight programme of Boeing's 787 Dreamliner will have to be pushed back (again).
ECONOMIST: Business this week
It was always going to be a test flight - the first of two that have been planned to bring the shuttle programme back on track.
BBC: NEWS | Science/Nature | Nasa reflects on a 'great day'
应用推荐
模块上移
模块下移
不移动