• Soon after commissioning of Wanjiazhai Hydropower Station, it was found that the over hot problem existed in three transformers.

    在万家寨水电站投运不久,先后发现三台主变压器绝缘油色谱分析总烃超标,存在过热缺陷。

    youdao

  • On site installation supervision , commissioning of equipment, Production support and troubleshooting role after commissioning .

    现场安装指导,设备调试,生产支持,及故障排除。

    youdao

  • After commissioning, because of the increase of capacity and the high water cut, the fluid parameter has changed.

    投产后由于产量增加,原油含水率上升,运行参数发生了变化。

    youdao

  • After commissioning, because of the increase of capacity and the high water cut, the fluid parameter has changed.

    投产后由于产量增加,原油含水率上升,运行参数发生了变化。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定