Soon after commissioning of Wanjiazhai Hydropower Station, it was found that the over hot problem existed in three transformers.
在万家寨水电站投运不久,先后发现三台主变压器绝缘油色谱分析总烃超标,存在过热缺陷。
On site installation supervision , commissioning of equipment, Production support and troubleshooting role after commissioning .
现场安装指导,设备调试,生产支持,及故障排除。
After commissioning, because of the increase of capacity and the high water cut, the fluid parameter has changed.
投产后由于产量增加,原油含水率上升,运行参数发生了变化。
After commissioning, because of the increase of capacity and the high water cut, the fluid parameter has changed.
投产后由于产量增加,原油含水率上升,运行参数发生了变化。
应用推荐