Maintenance should be done after commissioning for about five minutes, confirm no abnormal phenomenon to boot.
检修后应进行试运转五分钟左右,确认无异常现象再开机运转。
After commissioning, because of the increase of capacity and the high water cut, the fluid parameter has changed.
投产后由于产量增加,原油含水率上升,运行参数发生了变化。
During approximate two years after commissioning, the good performance of the seepage proof curtain was observed.
运行将近两年,基础防渗帷帷幕运行性状良好。
应用推荐