• This attack is similar to the ping flood attack but with a clever modification to the process.

    这种攻击类似于ping洪水攻击,但它能巧妙地修改进程。

    youdao

  • Once the attack begins, websites can try to trace the sudden flood of traffic back to the source computer and filter it out, but even that's a complex process.

    一旦攻击开始,网站可以尝试追踪突发洪水般的流量找到源计算机并对此加以过滤,但这是一个复杂的过程。

    youdao

  • The process of urbanization has a significant impact on the hydrological characteristics of a city, which causes the special and complex nature of the calculation method of urban flood.

    城市化进程对城市水文特性产生了重大影响,造成了城市洪水计算的特殊性与复杂性。

    youdao

  • Mainly around Lueyang Han Jialing River flood water introduces water conservancy project construction of embankment construction procedures, as well as a key step in the construction process.

    主要围绕略阳县嘉陵江西汉水干流防洪工程的建设介绍了水利工程的堤防施工程序,以及施工过程中的关键工序。

    youdao

  • Flood risk management is a continuous, circular and dynamic process.

    风险管理过程是不断循环和完善的过程。

    youdao

  • Triggered by outburst flood, mudflow is a kind of debris flow and also a form of soil erosion, and it is an indicator of the most serious soil erosion process in the Loess Plateau.

    黄土泥流是黄土地区一类重要的灾害地貌过程,是泥石流的一个特殊类型,是水土流失的一种特殊形式,也是山地环境恶化、水土流失极严重的标志。

    youdao

  • The inside of the Yellow River flood control project management-the status quo analysis of the management process and the causes of the problems that exist, and Solutions to make a few suggestions.

    该文阐述了黄河河道内非防洪工程建设项目管理的目前状况,分析了管理过程中存在的新问题及其产生的原因,提出几点解决策略和建议。

    youdao

  • Based on a lot of observed river data, analyses were conducted on the evolution process and the flood discharging capacity of the shashi to Haoxue stretch of upper Jingjiang River.

    在大量实测河道资料基础上,分析了上荆江临江河段演变的基本规律、发展趋势及河道过洪能力。

    youdao

  • Designed flood of reservoir is a typical flooding process under given engineering safety standard. The frequency of designed flood is regarded as hydrological risk.

    水库设计洪水就是在给定工程安全标准情况下某个典型洪水过程,设计洪水的频率特征表现的就是其水文风险。

    youdao

  • Adaptive filtering in time series analysis is used to predict a stream flood. The key in this process is determination of the adaptive constants and the number of weighted factors.

    尝试用时间序列分析中的自适应滤波法对江河灾害性洪水进行预测,认为加权因子个数和自适应常数的确定是关键。

    youdao

  • Actually, I agree with your comments on penetration point, we may need to enhance the engagement and consultation process for a good communication between stakeholders in the Flood risk Appraisal.

    实际上我同意你对于突破点的评述,我们可能需要在洪水风险评价中加强与利益相关者的合作与磋商。

    youdao

  • The overall process of constructing a hydropower project is the sub-period of controlling and leading flood.

    水电水利工程建设的总过程就是分时段对水流 进行控制和疏导的 过程。

    youdao

  • The overall process of constructing a hydropower project is the sub-period of controlling and leading flood.

    水电水利工程建设的总过程就是分时段对水流 进行控制和疏导的 过程。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定