... (implementation conformance statement) GB/T 17178.7—XXXX/ISO/IEC 9646-7 2 IUT 被测实现 (implementation under test) ISP 国际标准化轮廓 (international standardized profile) IXIT 测试用的实现额外信息(implementation extra information f...
基于34个网页-相关网页
可控性是指测试系统控制被测实现(IUT)按照一定顺序接收输入的能力。
Controllability is the capability of the test system to force the Implementation Under test (IUT) to receive inputs in a given order.
频率测量一般是通过对被测信号和标准信号计数实现,因此量化误差是引起测量误差的主要原因。
Frequency measurement is usually implement by accounting the measured signals and standard signals, thus quantizing error becomes the main source of measuring error.
这种电路具有等电位隔离特性,能消除电网络中其它电阻对被测电阻的影响,可实现网络电阻的直接测量。
The effect of the other resistors in an electric network on the measured resistors can be removed and it is possible to measure network resistors directly by this circuit.
应用推荐