高程变化 elevation change
行程变化 change of stroke
沿程变化 change along ; change along the river
程变化命令 engineering change order ; ECO
工程变化命令 Engineering Change Order ; ECO
程变化管理 Business Process Change Management
程序变化 PTN procedure turn
流程变化管理 BPCM ; Business Process change management
企业流程变化管理 Business Process change management
变化程度百分比 Precent
细胞凋亡百分率的时程变化规律与TUNEL阳性细胞数的变化规律一致。
The time course of apoptotic percentage paralled that of TUNEL-positive cells.
坡长是决定坡面能量沿程变化,影响坡面径流与水流产沙过程的重要地貌因素之一。
Slope length is one of the important topographical factors that can determine the energy change along a slope and affect the overland runoff and sediment process.
管理人员觉得他们几乎无法在入程变化之前将其稳固,更谈不上对其入行建模后预测其机能。
Managers feel that they are hardly able to stabilize a process before it changes, let alone model the process for performance prediction.
And so, there is the distinction between fixed schedules versus ratios, variable schedules and ratio versus interval.
因此,在固定时程与变化时程之间,以及在比率与间隔之间,存在着一些区别。
And fixed versus variable speaks to whether you give a reward on a fixed schedule, every fifth time, or variable, sometimes on the third time, sometimes on the seventh time, and so on.
固定与变化则是相对于,你是否根据固定时程给予奖励而言的,每五次就给予奖励,或者是变化的,有时候在第三次上给予奖励,有时候则在第七次上给予奖励。
应用推荐