所有材料(钢筋、模板等等)的运输、施工,所有必须的施工辅助设施和手段均包括在单价中。
The delivery and construction of all the material, (rebar, formwork, etc), all necessary construction must be included in the unite price.
第一辅助洞没有斜井或竖井,施工辅助洞采用全射流纵向通风。第二辅助洞埋深大,洞体长,洞形断面小。
First, there is no slope hole or silo, the auxiliary hole of construction adopts longitudinal ventilation only by jet Second, it belongs to deep buried hole, long body, little shape section.
综合工区:负责所有机械设备的维修、保养以及本项目的辅助工程施工等管理工作。
Complex processing area: be responsible for repair and maintenance of all mechanical equipment, construction of the project's ancillary works and other management work.
应用推荐