指出公路项目质量管理必须从以下四个阶段抓起即项目决策阶段、设计阶段、施工阶段、交工竣工验收阶段。
The quality management Muse be take from four side as follow; project decision making stage, design stage, construct stage and finish check and accept stage in our province.
该项目目前处于施工图设计阶段。
通过对预应力束设计阶段和施工阶段的分析, 说明了以NURBS作为预应力束几何模型的内在原因。
Prestressed strands in design and construction are analyzed, with reasons for selection of NURBS as the strands model.
应用推荐