指出公路项目质量管理必须从以下四个阶段抓起即项目决策阶段、设计阶段、施工阶段、交工竣工验收阶段。
The quality management Muse be take from four side as follow; project decision making stage, design stage, construct stage and finish check and accept stage in our province.
主要探讨在桥梁施工过程中,针对方案预选到桥型设计阶段的计算机辅助技术的应用问题。
This paper mainly discusses about the practical problem of the computer-assisted technology during the stage from the project choice to the bridge type design in the course of the bridge construction.
在设计阶段,由于地质资料有限,对施工风险的评估和控制还不能满足风险控制要求。
In the design phase, due to the limited geological information on risk assessment and control of construction can not meet risk control requirements.
该项目目前处于施工图设计阶段。
轿车涂装需要在高洁净的车间环境中进行,车间洁净度的控制必须从设计阶段就开始考虑,并贯穿施工及生产等全过程。
To coating car under great clean environment in the workshop and take it into consideration from design, and run through construction and production.
研究结果表明,土的结构性不但在设计阶段要考虑,同时在施工阶段也要严格控制施工速率,以免引起工程失稳。
The research result show that soils' configuration not only should be considered in stage of design but also in stage of construction, which lest bringing breakage of engineering.
通过对预应力束设计阶段和施工阶段的分析, 说明了以NURBS作为预应力束几何模型的内在原因。
Prestressed strands in design and construction are analyzed, with reasons for selection of NURBS as the strands model.
从项目决策阶段、设计阶段、招投标阶段、施工阶段,竣工结算阶段等几个方面对建设工程造价控制做了介绍。
The paper introduces how to control the cost of construction works from item decision-making phase, design phase, tender phase, construction phase and settlement phase.
声学独创的“声管家”服务,从项目立项科研阶段-项目设计阶段-项目施工阶段-竣工验收阶段。
The "Sound Steward" service ZISEN pioneered covers every phase from project approval, investigation, design, construction, completion and acceptance.
而项目管理程序和作业文件主要从项目立项决策阶段、设计阶段、施工阶段、采购阶段、竣工验收与试运行阶段等几个阶段来论述。
Moreover, project management procedure and task document emphasis on the phases of setting and deciding a project, design, construction, purchase and finishing and pre-running.
文章介绍了练江连拱短隧道在勘测设计阶段进行多方案比选研究的情况及施工过程中方案调整的情况。
This paper describes the alignment alteration of Lianjiang tunnel with continous arches in the planning phase and the solution modification during construction.
在分析水泥混凝土路面早期裂缝产生原因的基础上,提出在混合料组成设计阶段和现场施工阶段应该采取的措施,对工程实践具有重要的意义。
Based on analysis for reasons of cement concrete pavement inchoate cracks, it is important to present relevant prevention methods in mixture design and construction stage.
本文结合工程造价管理经验,从投资决策阶段、设计阶段、施工阶段阐述了如何对工程造价进行全过程控制。
The total process control of engineering cost management is discussed by three stages of investment decision, design and construction.
铁路施工组织方案比选,是铁路初步设计阶段设计文件的重要组成部分。
Appraisement methods, which means giving the appraisal of railway construction organization variant, is an important component part of design document at the preliminary design stage.
阐述了在初步设计和施工图设计阶段控制工程造价应遵循的原则与方法。
The text expatiate the tenet and method that should be follow to control project cost during pre design and detailed design for construction section.
从设计阶段、投标阶段、施工阶段、竣工结算阶段阐述了造价监理工程师在监理工作中的地位和作用,并明确了造价监理工程师在各个阶段的责任。
From the different stages — designing, bidding, constructing and settling accounts, discussion is made on the status and function of a costing and supervising engineer.
我们可以否定竞赛任务书中的条条框框进行创作,在施工阶段结合使用要求修正设计阶段的意图。
The rules and regulations of a competition can be discarded in pursuit of a unique design and then the design intentions can be changed due to site requirements during the construction phase.
造价控制贯穿于工程项目建设的全过程,阐述了设计阶段、招标投标阶段、施工阶段和竣工阶段控制工程造价的措施。
Cost control runs through the whole process of construction projects. The cost control measures of design phase, bidding phase, construction phase and completion phase of construction are described.
在初步设计、施工图设计阶段分别编制初步设计概算书和施工图设计预算书,进一步优化成本预算。
During the period of preliminary design and construction drawing design, the budget statement should be prepared respectively so as to optimize the cost estimate.
在初步设计、施工图设计阶段分别编制初步设计概算书和施工图设计预算书,进一步优化成本预算。
During the period of preliminary design and construction drawing design, the budget statement should be prepared respectively so as to optimize the cost estimate.
应用推荐