首先对裂缝的产生机理进行了综述,根据实际施工总结控制措施。
The cracks mechanism is reviewed, control measures are summarized according to the actual construction.
文章通过对大(理)保(山)高速公路19合同段箱形拱桥的施工总结,简要介绍该桥的吊装方法及监控措施。
Through summary to the construction of Contract 19 Section box arch bridge along Dali-Baoshan Highway, this paper briefly introduces the hoisting method and monitoring control measures of this bridge.
在了解工作间之后,我们将会创建一个报告与执行总结,以实施工作间中没有涉及到的最佳实践。
After the workshop, we will create a report and executive summary for you with our Suggestions for implementing the best practices that were uncovered in the workshop.
应用推荐