这一技术在铁路、公路和拦河堤坝等一般堆石坡面施工中的推广应用前景也十分广阔。
This solution can be widely promoted for general rockfill slope protection in other fields such as railway , highway , river dike etc .
小山水电站工程由钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。
The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.
本文采用动力非线性有限元法研究了钢筋混凝土面板堆石坝的地震反应,并用滑移面上的静、动应力求得坝坡抗震稳定安全系数时程曲线。
A study on the dynamic response of a rockfill dam with reinforced concrete facing excited by earthquake by means of nonlinear finite element method was presented in this paper.
应用推荐