这一技术在铁路、公路和拦河堤坝等一般堆石坡面施工中的推广应用前景也十分广阔。
This solution can be widely promoted for general rockfill slope protection in other fields such as railway , highway , river dike etc .
小山水电站工程由钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。
The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.
本文采用动力非线性有限元法研究了钢筋混凝土面板堆石坝的地震反应,并用滑移面上的静、动应力求得坝坡抗震稳定安全系数时程曲线。
A study on the dynamic response of a rockfill dam with reinforced concrete facing excited by earthquake by means of nonlinear finite element method was presented in this paper.
混凝土挤压式边墙技术是混凝土面板堆石坝上游坡面施工的新方法。
The concrete crushing type sidewall technology is a new method for constructing the upstream side slope of concrete face rockfill dam.
本文对采用线性与非线性抗剪强度的有限元法和极限平衡法分析堆石坝坝坡稳定性进行了比较。
In this paper, stability safety factors of the rockfill dam slope are compared by finite element method and limiting equilibrium method by the use of linear and nonlinear shear strength.
最后,采用有限元强度折减技术分析了糯扎渡心墙堆石坝及长河坝心墙堆石坝上下游坝坡的抗震稳定性。
Finally, the shear strength reduction technique is used to analyze the seismic stability of Nuo Zhadu core wall type rockfill Dam and Chang Heba core wall type rockfill Dam in FEM.
面板堆石坝垫层料上游坡面施工直接关系面板的质量、大坝施工进度及施工成本。
Slope construction at upper reach of bedding materials of the concrete face rock-fill dam directly relates to the quality of concrete face, dam construction progress and cost of construction.
挤压式混凝土边墙技术是混凝土面板堆石坝上游坡面施工的新方法。
The technique of extruded concrete side wall is a new method for construction of upstream face slab of CFRD, which was first used during construction of the Ita dam in Brazil.
本文就如何模拟高陡岸坡附近堆石体的边界条件展开工作。
The paper is emphasis on how to simulate the boundary condition of the enrockment near the high steep bank slope.
洪家渡面板堆石坝处于高山峡谷岩溶地区,左岸边坡陡峻。
The concrete face rockfill dam of Hongjiadu Hydropower Station located in deep mountain gorge of karst district, its left bank is high bluff side.
混凝土挤压边墙技术是混凝土面板堆石坝上游坡面施工的新方法。
The construction technique of concrete crushing-type side wall is a new method in concrete facing rockfill dam.
混凝土挤压边墙技术是混凝土面板堆石坝上游坡面施工的新方法。
The construction technique of concrete crushing-type side wall is a new method in concrete facing rockfill dam.