在施工地质工作的基础上,对柏叶口水库工程面板堆石坝坝基进行了工程地质评价。
On the basis of construction geology works, the engineering geology assessment is carried out for the dam base of Baiyekou Reservoir in this paper.
在施工中,预制化是个基本的标准。 这意味着安装过程可以在短短几天之内完成而无需在施工地点进行更长的等待过程。
Prefabrication was an essential criteria in the construction meaning that the installation process can happen within a couple of days without an elongated process on a construction site.
每个工地上都有一座活动房用来在施工期间盛放各种设备。
Each site had a Quonset hut on site where building equipment was stored during construction.
应用推荐