·2,447,543篇论文数据,部分数据来源于NoteExpress
发电机电参量测试是出厂试验必不可少的一部分。
Electric quantity test of generator is absolutely necessarily in delivery test.
在适当时候,专业工程师将参与设备的出厂试验以及开箱验收工作。
In the due time, the professional engineers will take part in the ex-works test, the check and accept of the equipment.
在这种背景下,我们进行了基于计算机的变压器出厂试验系统的研究。
In the background we carried through the research of the transformer's delivery test system based on computer.
应用推荐