主循环泵转动惯量的取值是停堆初期冷却阶段的关键问题。
The running inertia of the main coolant pump is the key problem of the primary phase.
本机采用双压床设计,即在A床胶合完成进入冷却阶段,B床便可以进行胶合作业。
This machine adopts double-press-bed design, that is, the completion of A-Bed glued into the Cooling Stage, B-bed operation can be glued.
对比发现,按测得的冷却特性曲线的形状划分的冷却阶段,与探棒表面实际发生的冷却情况大不相同。
It was found that partition of cooling process according to the measured cooling rate curve is not totally corresponding to what were visually observed.
应用推荐