Hauling system is key equipment in the main cable erection of suspension bridge. It is a complex system which consist of many kinds of mechanic and the operators.
牵引系统是悬索桥主缆架设施工的关键设备,它是多种机械设备与操作人员组成的一个复杂的大系统。
In addition, the strands will be loaded unevenly because of the error of the main cable wire manufacture and erection, and the structural reasons of structure itself.
此外,由于主缆丝股制造和架设长度的误差及结构本身构造的原因也会使丝股之间发生应力不均匀现象。
This paper mainly introduces the cable erection construction experience and the key control points of main span arch boxes of Wentanghe Extra Large Bridge on Chongqing-Linshui Expressway.
主要介绍了渝邻高速公路温塘河特大桥主跨拱箱缆索吊装的施工经验及控制要点。
应用推荐