• Hauling system is key equipment in the main cable erection of suspension bridge. It is a complex system which consist of many kinds of mechanic and the operators.

    牵引系统悬索桥架设施工关键设备多种机械设备操作人员组成一个复杂的大系统。

    youdao

  • In addition, the strands will be loaded unevenly because of the error of the main cable wire manufacture and erection, and the structural reasons of structure itself.

    此外由于制造架设长度误差结构本身构造原因使丝股之间发生应力不均匀现象。

    youdao

  • This paper mainly introduces the cable erection construction experience and the key control points of main span arch boxes of Wentanghe Extra Large Bridge on Chongqing-Linshui Expressway.

    主要介绍了高速公路温塘河特大主跨缆索吊装施工经验控制要点

    youdao

  • Furthermore, the analysis and discussion have been done on the problem of making an active correction to the formwork erection elevation of the main beam and cable force.

    主梁立模标高斜拉张拉索力主动修正问题进行分析讨论

    youdao

  • The method of measurement and data analysis of temperature of the main cable during the erection of suspension bridges are presented.

    介绍悬索桥架设期间温度测试方法数据分析,并以我国两座悬索桥——汕头海湾桥和西陵长江大桥为例予以阐述。

    youdao

  • The method of measurement and data analysis of temperature of the main cable during the erection of suspension bridges are presented.

    介绍悬索桥架设期间温度测试方法数据分析,并以我国两座悬索桥——汕头海湾桥和西陵长江大桥为例予以阐述。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定